FRENCH-AMERICAN SCHOOL OF NEW YORK
DRAFT ENVIRONMENTAL IMPACT STATEMENT
Please note that this document has been prepared by FASNY and
its consultants. It has been submitted to the City of White Plains
Common Council, acting as Lead Agency under the State Environmental
Quality Review Act. This DEIS has been accepted as complete
on August 6, 2012. This determination of adequacy(or “completeness”) does not
express, either implicitly or explicitly, any agreement by
the Lead Agency as to the interpretations or conclusions drawn by FASNY
and its consultants, or resolution of any issues
presented in the DEIS.
DEIS
Interior Cover Sheet
Introduction
Table of Contents
Executive Summary
Chapter 1
Project Description
Chapter 2
Land Use, Zoning, and Public Policy
Chapter 3
Geology, Soils and Topography
Chapter
4 Wetlands, Hydrology and Stormwater
Chapter 5
Vegetation and Wildlife
Chapter 6
Historic and Cultural Resources
Chapter
7 Visual Impact and Community Character
Chapter
8 Community Services and Facilities
Chapter 9
Infrastructure
Chapter
10 Socioeconomic Character and Fiscal Impacts
Chapter 11
Traffic and Transportation
Chapter 12
Air Quality
Chapter 13
Noise
Chapter 14
Hazardous Materials
Chapter 15
Construction
Chapter 16
Alternatives
Chapter 17
Mitigation
Chapter 18
Use and Conservation of Energy
Chapter 19
Growth Inducing Impacts
Chapter
20 Irreversible and Irretrievable Commitments of Resources
Chapter 21
Unavoidable Impacts
APPENDICES
A.
Adopted Scope
B.
Conservancy Master Plan
C.
Geotechnical Report
D. Stormwater
Pollution Prevention Plan
E. Wetlands
E-1. Wetland Delineation Report
E-2. Correspondence with US Army Corps of Engineers
E-3. Certifications
F. Tree
Survey
G. NHP Correspondence
G-1.
NHP Correspondence
G-2.
Westchester County List of Threatened and Endangered Species
H.
OPRHP Correspondence
I. Emergency Services
I-1.
White Plains Emergency Services Response
I-2.
Larchmont Emergency Services Response
I-3.
Mamaroneck Emergency Services Response
I-4.
Scarsdale Emergency Services Response
J. Traffic
J-1.
Existing Conditions Data Collection and Synchro Outputs
J-2.
Observed Gap Times
J-3.
License Plate Surveys
J-4.
Pedestrian Counts
J-5.
No Build Volume Detail
J-6.
Year 2019 No Build Synchro Outputs
J-7.
Traffic Management Plan
J-8.
Existing Campus Operations
J-9.
Travel Route Surveys
J-10.
Year 2019 Build Synchro Outputs and Signal Warrant Analysis
J-11.
Year 2019 Build with Improvements Synchro Outputs
J-12.
Adaptive Signal Control Systems
K. Noise Monitoring
K-1. Athletic Event Noise Technical Memo
K-2. Parking Lot Noise Assessment
K-3. Mechanical Equipment Noise Assessment
K-4. Mechanical Equipment Specifications
L. Phase I ESA and Phase II
L-1.
Phase I ESA
L-2.
Phase II
M.
Construction Management Plan
N. Large Scale Drawings
John Meyer Consulting, PC Site Plan
Drawings
SP-1
Cover Sheet
SP-2
Overall Existing Conditions Plan
SP-3
Overall Site Layout Plan
SP-4
Site Layout Plan (Area 1)
SP-5
Site Layout Plan (Area 2)
SP-6
Site Layout Plan (Area 3)
SP-7
Site Layout Plan (Area 4)
SP-8
Site Grading Plan (Area 1)
SP-9
Site Grading Plan (Area 2)
SP-10
Site Grading Plan (Area 3)
SP-11
Site Grading Plan (Area 4)
SP-12
Site Utilities Plan (Area 1)
SP-13
Site Utilities Plan (Area 2)
SP-14
Site Utilities Plan (Area 3)
SP-15
Site Utilities Plan (Area 4)
SP-16
Site Sediment & Erosion Control Plan (Area 1)
SP-17
Site Sediment & Erosion Control Plan (Area 2)
SP-18
Site Sediment & Erosion Control Plan (Area 3)
SP-19
Site Sediment & Erosion Control Plan (Area 4)
SP-20
Site Landscaping Plan (Area 1)
SP-21
Site Landscaping Plan (Area 2)
SP-22
Site Landscaping Plan (Area 3)
SP-23
Site Landscaping Plan (Area 4)
SP-24
Construction Details
SP-25
Construction Details
SP-26
Construction Details
SP-27
Construction Details
SP-28
Construction Details
SP-29
Construction Details
SP-30
Construction Details
SP-31
Driveway Profiles
SP-32
Driveway Profiles
James G. Rogers Architects Drawings
A1
Upper School Proposed Floor Plans
A2
Upper School Proposed Floor Plans
A3
Upper School Proposed Building Elevations
A4
Middle School Proposed Floor Plans
A5
Lower School Proposed Floor Plans
A6
Lower School Proposed Building Elevations
A7
Physical Education & Performing Arts Building
Proposed Floor Plans
A8
Physical Education & Performing Arts Building
Proposed Building Elevations
O. Infrastructure
O-1.
ConEd Service E-mail
O-2.
Sanitary Sewer Flow Monitoring Report
O-3.
Sanitary Sewer Video Inspection Report