DRAFT SUPPLEMENTAL ENVIRONMENTAL
IMPACT STATEMENT
SECTION TITLE
A. Project Purpose, Public Need and Benefits
1. History of the project site
2. Objective of the Applicant
3. Prior projects of the Applicant
4. Benefits of the proposed project
5. Summary of review and approval history
B. Location
1. Description of the project site and surrounding area
C. D esign and Layout
1. Description of proposed structures and site improvements
2. Description of proposed impervious areas, land to be disturbed, required grading and removal of vegetation
D. Construction Period and Schedule
E. Required Permits and Approvals
F. List of SEQRA Involved and Interested Agencies
A. Existing Legal Limitations/Restrictions on Property Development
B. Zoning and Town Code Compliance
C. Wetlands and Stormwater Management
1. Description of existing conditions
2. Description of measures developed by Applicant to address wetland and stormwater management issues
3. Anticipated impacts and mitigation
D Transportation
1. Existing Conditions
a. Existing transportation resources
b. Discussion of vehicular accident history data
c. Description of pedestrian circulation patterns
2. Traffic
a. Description of prior traffic studies
b. Update of prior traffic studies
c. Anticipated impacts and mitigation
3. Transit
a. Description of circulation routes designed in consultation with the Westchester DOT
b. Anticipated impacts and mitigation
E. Market Conditions
1. Description of prior analyses of market conditions
2. Update to prior analyses
3. Anticipated impacts and mitigation
F. Infrastructure
1. Description of existing conditions
2. Proposed improvements
3. Anticipated impacts and mitigation
G. Visual Issues
1. Description of visual impacts
2. Anticipated impacts and mitigation
H. Noise
1. Discussion of relevance of Westchester County Airport 65 Ldn noise contour
2. Anticipated impacts and mitigation
I. Historic and Archeological Resources
1. Description of prior historic analyses and existing conditions
2. Anticipated impacts and mitigation
J. Construction Impacts and Mitigation
1. Soil erosion and sedimentation transport
2. Traffic and logistics
3. Maintenance of roadways, parking areas, utilities and open spaces
LIST OF FIGURES
LIST OF TABLES
| NO. | TITLE |
| I.A-1 | Discretionary Project Permits and Approvals |
| II.E-1 | Discretionary Project Permits and Approvals |
| III.C-1 | Summary of Existing Peak Rates of Runoff |
| III.C-2 | Summary of Proposed Peak Rates of Runoff |
| III.D-1 | Site Generated Volumes |
| III.D-2 | Peak Hour Traffic Volume Comparison |
| III.D-3 | Intersection Operations-Peak AM Hour |
| III.D-4 | Intersection Operations-Peak PM Hour |
| III.E-1 | Total Employment New York-White Plains-Wayne, NY-NJ Metropolitan Area |
| III.E-2 | Westchester County and Project Area Employment |
| III.E-3 | Commuting Origin of Westchester Workers |
| III.E-4 | Commuters to Jobs in Harrison/Purchase |
| III.E-5 | County Origin of Harrison Based Jobs |
| III.E-6 | Employed and Projected Labor Pool By County 2005-2025 |
| III.E-7 | 2000-2006 National and Westchester County Commercial Office Vacancy Rates |
| III.E-8 | Gross Absorption Rate: Westchester County Office Space (in Square Feet) |
| III.E-9 | Examples of Recent Lease Activity in Project Area |
| III.E-10 | Available Class A Office Space in Project Vicinity |
APPENDIX TITLE
A. "Scope For the Draft Supplemental Environmental Impact Statement," dated October 10, 2005
B. Letter to Related Properties from Bernard Grossfield, PE, Consulting Engineer, dated June 23, 2006
C. "Market Analysis of Parcel B" by AKRF, Inc., dated December 1, 2006
D. Memorandum of Town Village Engineer, dated May 28, 2002
E. "Environmental Assessment" by Dru Associates, Inc., dated August 30, 2006
F. "Phase 1A Cultural Resources Survey" by John Milner Associates, Inc., dated August 2006
G. Noise Assessment letter by Potomac-Hudson Engineering, Inc., dated August 22, 2006
H. Letter from Westchester County Department of Environmental Facilities, dated August 29, 2006
K. Parking Variance by Town of Harrison Board of Zoning Appeals, dated May 19, 1986
L. Letter from New York State Department of Transportation, dated February 27, 2001
T. November 27, 1984 Determination and SEQRA Findings of the Planning Board regarding the development on Parcel B of a single building of 355,000 square feet to be constructed and occupied in two phases
U. May 23, 2000 Planning Board Resolution designating the Planning Board as the lead agency for the SEQRA review of PCPA’s March 2000 application
V. March 25, 2003 SEQRA Positive Declaration issued by the Planning Board
| SEC. | TITLE |
| I. | DESCRIPTION OF PROJECT |
| II. | |
| III. | |
| IV. | |
| V. | |
| VI. | |
| VII. | |
| VIII. | |
| IX. | |
| X |
APPENDIX TITLE
A. FIGURES
B. TABLES
C. INTERSECTION CAPACITY ANALYSES
D. DRAWING
LIST OF FULL-SCALE DRAWINGS
A. John Meyer Consulting, P.C.
| SHEET NO. | TITLE |
REV. NO./DATE |
| SP-1 | "CoverSheet" | 10/26/2006 |
| SP-2 | "Existing Conditions Map" | 10/26/2006 |
| SP-3 | "Layout & Striping Plan" | 10/26/2006 |
| SP-4 | "Grading Plan" | 10/26/2006 |
| SP-5 | "Utilities Plan" | 10/26/2006 |
| SP-6 | "Sediment & Erosion Control Plan" | 10/26/2006 |
| SP-7 | "Conceptual Landscaping Plan" | 10/26/2006 |
| SP-8 | "Driveway Profile" | 10/26/2006 |
| SP-9 | "Construction Details" | 10/26/2006 |
| SP-10 | "Construction Details" | 10/26/2006 |
| SP-11 | "Construction Details" | 10/26/2006 |