This version of the DEIS has been updated to incorporate a DEIS Addendum that was distributed on June 14, 2012 to all original recipients of the DEIS dated May 2012. A subsequent DEIS Addendum was distributed on June 25, 2012 to all original recipients of the DEIS dated May 2012.
Notice of Completion of Draft EIS and Notice of HearingA. Land Use, Planning and Zoning B. Geology and Soils C. Topography and Slopes D. Vegetation, Wildlife, and Ecology E. Wetlands F. Water Resources and Stormwater Drainage G. Traffic, Transportation, Access, Off-Street Parking and Loading H. Air Quality and Noise I. Utilities and Services J. Community Facilities and Services K. Open Space and Recreational Facilities L. Economic and Fiscal Impacts M. Cultural and Visual Resources N. Construction ImpactsIV.   ALTERNATIVES TO THE PROPOSED PROJECT V.   ADVERSE ENVIRONMENTAL EFFECTS THAT CANNOT BE AVOIDED IF THE PROJECT IS IMPLEMENTED VI.   IRREVERSIBLE AND IRRETRIEVABLE COMMITMENTS OF RESOURCES VII.   GROWTH-INDUCING IMPACTS VIII.  EFFECTS ON THE USE AND CONSERVATION OF ENERGY RESOURCES IX.   REFERENCES X.   APPENDICES
A.   Figures B.   Primary Analysis C.   Sensitivity Analysis D.   UWMS Usage Projections E.   Tables F.   Intersection Operations Primary Analysis G.   Intersection Operations Sensitivity Analysis H.   Automatic Traffic Recorder Summary I.    Peak Hour Factors J.    2008 Existing Volumes K.   2018 No-Build Volumes L.   Primary Analysis 2018 Build Volumes M.   Sensitivity Analysis 2018 Build Volumes N.   Accident Information O.   Traffic Counts
A.   Existing Hydrologic Calculations B.   Proposed Hydrologic Calculations C.   Runoff Reduction Volume, Water Quality Volume and Stream Channel Protection Sizing Calculations D.   Infiltration System Volume Sizing Calculations E.   Soil Percolation & Deep Hole Test Data F.   Construction Inspection Checklists G.   Operation and Maintenance H.   Contractor’s Certification I.   Owner's Certification J.   Pollutant Loading Calculations K.   Drawings