UPPER WESTCHESTER MUSLIM SOCIETY MASJID AND ISLAMIC CENTER

DRAFT ENVIRONMENTAL IMPACT STATEMENT

This version of the DEIS has been updated to incorporate a DEIS Addendum that was distributed on June 14, 2012 to all original recipients of the DEIS dated May 2012. A subsequent DEIS Addendum was distributed on June 25, 2012 to all original recipients of the DEIS dated May 2012.

Notice of Completion of Draft EIS and Notice of Hearing

DEIS VOLUME I

Cover and Table of Contents

I.    EXECUTIVE SUMMARY
II.   DESCRIPTION OF THE PROPOSED ACTION
III.   IMPACT ISSUES
A. Land Use, Planning and Zoning
B. Geology and Soils
C. Topography and Slopes
D. Vegetation, Wildlife, and Ecology
E. Wetlands
F. Water Resources and Stormwater Drainage
G. Traffic, Transportation, Access, Off-Street Parking and Loading
H. Air Quality and Noise
I. Utilities and Services
J. Community Facilities and Services
K. Open Space and Recreational Facilities
L. Economic and Fiscal Impacts
M. Cultural and Visual Resources
N. Construction Impacts
IV.   ALTERNATIVES TO THE PROPOSED PROJECT
V.   ADVERSE ENVIRONMENTAL EFFECTS THAT CANNOT BE AVOIDED IF THE PROJECT IS IMPLEMENTED
VI.   IRREVERSIBLE AND IRRETRIEVABLE COMMITMENTS OF RESOURCES
VII.   GROWTH-INDUCING IMPACTS
VIII.  EFFECTS ON THE USE AND CONSERVATION OF ENERGY RESOURCES
IX.   REFERENCES
X.   APPENDICES

DEIS VOLUME II

Cover and Table of Contents

A.   Full Environmental Assessment Form
B.   State Environmental Quality Review Positive Declaration
C.   DEIS Final Adopted Scope
D.   Phase 1A/1B Archeological Survey
E.   Letter from John Milner Associates, Inc
F.   Confirmation of Wetlands Boundary
G.   Biological Assessment Report
H.   Wetlands Delineation and Functional Assessment Report
I.   Correspondence
J.   Phase I" and "Phase II Environmental Site Assessment
K.   Jurisdiction Determination
K-I   Building Height Correspondence
K-II   Letter from NYC Department of Environmental Protection

DEIS VOLUME III

L. Traffic Data
A.   Figures
B.   Primary Analysis
C.   Sensitivity Analysis
D.   UWMS Usage Projections
E.   Tables
F.   Intersection Operations Primary Analysis
G.   Intersection Operations Sensitivity Analysis
H.   Automatic Traffic Recorder Summary
I.    Peak Hour Factors
J.    2008 Existing Volumes
K.   2018 No-Build Volumes
L.   Primary Analysis 2018 Build Volumes
M.   Sensitivity Analysis 2018 Build Volumes
N.   Accident Information
O.   Traffic Counts

DEIS VOLUME IV

M. Stormwater Pollution Prevention Plan
A.   Existing Hydrologic Calculations
B.   Proposed Hydrologic Calculations
C.   Runoff Reduction Volume, Water Quality Volume and Stream Channel Protection Sizing Calculations
D.   Infiltration System Volume Sizing Calculations
E.   Soil Percolation & Deep Hole Test Data
F.   Construction Inspection Checklists
G.   Operation and Maintenance
H.   Contractor’s Certification
I.   Owner's Certification
J.   Pollutant Loading Calculations
K.   Drawings

JMC Full Scale Drawings

CS   Cover Sheet
SP-1   Overall Existing Conditions Plan
SP-2   Demolition Plan
SP-3   Layout Plan
SP-4   Grading Plan
SP-5   Utilities Plan
SP-6   Sediment and Erosion Control Plan and Tree Protection Plan
SP-7   Landscaping Plan
SP-8   Construction Details
SP-9   Construction Details
SP-10   Construction Details
SP-11   Construction Details
SP-12   Construction Details
SP-13   Construction Details
SP-14   Site Cross Sections
SP-15   Site Cross Sections

KG&D Architects Full Scale Drawings

A-2   Floor Plans
A-3   Elevations